Ignitis Group almost completes Pomerania wind farm
The construction of the Polish wind farm in Pomerania is nearly over: Ignitis Group installed the last wind turbine at the end of November and with this step, reached a significant point of development.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed